Renovation risks when buying a Swiss home: roof, facade, heating and what lies behind the walls
Buyer’s guide · Published · By ImmoBrief
The price of a home is only part of what it costs you. A roof, a facade or a heating system at the end of its life can cost tens of thousands of francs, and in a condominium you pay your share whether you wanted the work or not. Much of this can be read before you buy, from the building’s age, its documents and a careful viewing.
This guide shows where the large renovation costs come from, which rules have changed, and how to turn what you see into questions, a price argument and clauses in the contract. For the viewing itself, see our viewing checklist.
Where this fits in the purchase: step 5 of our guide to buying a home in Switzerland, step by step.
1. The building’s age is a clue, not a diagnosis
Building parts wear out at different speeds. The joint table of the homeowners’ association HEV and the tenants’ association gives typical lifespans, for example 50 years for a pitched roof, 40 for a facade, 25 for insulated windows, 20 for a boiler or a heat pump, and 50 for radiators. The table was made for tenancy law, to decide what a tenant pays for damage, not to forecast renovations. Used with care it still tells you where to look.
Compare the year the building was built and the year of the last work on each part with these figures. A 40-year-old building whose roof and heating were renewed ten years ago is a different purchase from one where nothing has been done.
Write down the year built and the year of the last work on roof, facade, windows and heating, and ask for proof of each.
2. Roof and facade
The building envelope keeps water out and heat in. Ask about leaks, repairs and the state of the waterproofing, especially for flat roofs and terraces, where drainage and joints often fail first. A report that calls single parts sound does not prove the whole roof has years left.
Signs worth asking about: stains on ceilings and under windows, cracks in the facade, damp in the cellar, and fresh paint in only one spot.
Ask whether there were water damages or insurance claims, and for any report on roof or facade.
3. Heating: the rules have changed
Many cantons now require a renewable heating system when an oil or gas heating is replaced. Zurich has done so since 1 September 2022, where technically possible and unless, over its lifetime, it costs more than 5% more than a fossil replacement; Basel-Stadt has a similar rule. The cantons’ model energy law of 2025 makes renewable heating the rule on replacement, and the cantons are adopting it now.
For you this means that an old oil or gas heating close to the end of its life usually becomes a heat pump or a connection to district heating, often with a permit. Subsidies exist through the federal and cantonal buildings programme; you must apply before the work starts.
Ask for the heating’s age and service reports, and ask the municipality which rules apply when it is replaced.
4. The energy certificate (GEAK)
The cantons’ energy certificate for buildings (GEAK) rates the envelope, the overall efficiency and the CO2 emissions from A to G, and is valid for up to ten years. A GEAK Plus adds up to five renovation options with their costs. Some cantons require it: Fribourg for every building that is sold, Basel-Stadt for buildings with an oil or gas heating that is 15 years old or more.
Ask whether a GEAK or GEAK Plus exists, and read its renovation options as a first idea of the costs.
5. Electrics: a check is due when the property changes hands
Electrical installations in homes are checked every 20 years. On a change of ownership the law also requires a check if the last one is more than five years old, and this applies to the sale of a condominium unit too. The owner must have it done by an independent inspection body, and the result is a safety certificate (Sicherheitsnachweis).
Ask for the last safety certificate, and agree in the contract who orders and pays for the check that the sale requires.
7. In a condominium: who pays
Roof, facade, heating and pipes are usually common parts. The owners decide on their renewal, and the costs are shared by value quota; decisions taken before you buy bind you as the new owner. A private terrace can sit on the building’s common waterproofing, so a leak there may be the community’s matter, not yours alone.
Read the minutes for postponed works and special levies, and compare the renovation fund with what is coming.
Ask the administrator which works are decided or planned for the next ten years, and what your share would be.
8. From what you see to a decision, and to the price
Sort what you find into four kinds: damage that is confirmed, a risk that is likely, an open question, and a mere hint from age. Ask a specialist to look where large sums are possible. Documented renovation needs are a fair argument when you discuss the price, and what the seller assures you about past works belongs in the contract, where it counts if a defect appears later (defects and liability).
Put the renovations you expect, with a cost range and a source, next to the price before you make an offer.
Sources
- HEV Schweiz: the joint lifespan table (German)
- Tenants’ association: joint lifespan table 2024 (German)
- Raiffeisen: lifespans of building parts (German)
- Canton of Zurich: replacing a heating system (German)
- Canton of Basel-Stadt: fossil heating systems (German)
- Canton of Valais: the cantons’ model energy law 2025 (MuKEn 2025, German)
- The Buildings Programme: subsidies for energy renovation
- GEAK: the cantons’ energy certificate for buildings
- Canton of Fribourg: energy law, Art. 11a, GEAK at sale (German)
- Low-Voltage Installation Ordinance, annex: check on change of ownership (German)
- Federal Inspectorate for Heavy Current Installations: check on change of ownership (German)
- Federal Office of Public Health: asbestos (German)
- Suva: where asbestos is found in buildings (German)
- Radiological Protection Ordinance, Art. 155 and 166: radon
- Federal Office of Public Health: radon map of Switzerland (German)
- Civil Code, Art. 649a: decisions bind the buyer
- Civil Code, Art. 712h: shared costs
Sources checked on 21 November 2026. Energy rules are set by each canton and are changing: ask your municipality which apply to the property. This guide is general information, not legal, tax or financial advice.